Our volumes are steadily rising, with October being a record setter. Analytics for the year show that we have dramatically increased our productivity for each month starting in June. This growth in volume has been optimized by strategic acquisition of new facilities, which allows us to handle increasing project loads.
A second analysis of YTD Volumes (right) comparing 2010 (blue) and 2011 (red) shows cumulative totals for the whole year. In 2010 we moved over 1 million tons for the first time; in 2011 we hit the million ton mark in early September. We project that by the end of the year we will be over 1.5 million tons, an increase of 50% in volume.
